LOS ANGELES, CA Terminal Vertical Cores are essentially new front doors to terminals at LAX that allow for vertical circulation of passengers with...
Projects
Air Products Casa Grande
CASA GRANDE, AZ McWhirter Steel fabricated and assembled new pipe racks for Air Products, a world leader in the supply, distribution, and dispensing...
San Diego Terminal 1
SAN DIEGO, CA Subwork completed for the San Diego Airport Terminal 1 Project Contractor: W&W AfcoTonnage: 1750 tons
BC Gymnasium & Field House
BAKERSFIELD, CA The gym and field house project is part renovation, part new construction to create a state-of-the-art facility at Bakersfield...
CSUN Sierra Annex
NORTHRIDGE, CA New 62,500 SF, three-story Sierra Annex on land immediately south of Sierra Hall at California State University, Northridge. The...
999 Anthony St
BERKELEY, CA Laboratory and Office space. In the Vibrant Aquatic Park Center Campus in Berkeley, CA. Contractor: Dome ConstructionTonnage: N/A
La Quinta Gym & Pool
LA QUINTA, CA Construction of a new, state-of-the-art, gymnasium and pool building at La Quinta High School. Contractor: Miller ConstructionTonnage:...
Reata Glen
Rancho Mission Viejo, CA McWhirter Steel fabricated and installed 400 ton's of miscellaneous and structural Steel for Reata Glen Continuing Care...
OC Sanitation
Fountain Valley, CA McWhirter Steel fabricated and installed 1033 tons of steel for the OC Sanitation facility in El Segundo, CA. We completed this...
Topgolf
El Segundo, CA The Topgolf build, which encompassed a 12-acre project site and a 60,000-square-foot building, is an open-air, three-level venue that...
Google Midpoint
San Jose, CA McWhirter Steel fabricated and installed 1150 ton's of steel for a new mezzanine inside of an existing building. This project also...
Allogene Therapeutics
Los Angeles, CA McWhirter Steel fabricated and erected a complex spiral stair case and mezzanine at Allogene Thearapeutics. This project was...
LAX Automated People Mover Project
Los Angeles, CA McWhirter Steel provided 1750 tons of steel on the railway system for this prestigious project. The railway system will connect the...
LV Convention Center (Sub-Work)
Las Vegas, Nevada McWhirter Steel fabricated roughly 1000 tons on the Las Vegas Convention Center. We provided this sub work for W & W Afco Steel.
Bloom Energy Project
Los Angeles, CA McWhirter Steel furnished all of the steel for this sizable energy plant. We performed this job for Bloom Energy Corp.
Tom Bradley International Terminal
LOS ANGELES, CA The $1.7 billion West Gates at Tom Bradley International Terminal, a 15-gate concourse, is among the most modern in the world....
Santa Ana College
Santa Ana, CA Mcwhirter Steel helped construct a new 62,424 GSF two-story building for Santa Anna College. We completed this project for McCarthy...
Palmdale Medical Center
PALMDALE, CA McWhirter Steel constructed the new medical offices for Palmdale Medical Center. We completed this job for the Toneman Development Corp.
Burbank Town Center
BURBANK, CA The Burbank Town Center is a Mall that we helped renovate. McWhirter Steel fabricated steel for the mall's West Entry, Upper Level...
405 Mateo
LOS ANGELES, CA 405 Mateo are newly constructed office buildings that McWhirter Steel was the steel contractor for. The project delivery method was...
El Camino College Student Services Center
TORRANCE, CA McWhirter Steel fabricated 550 tons of steel for the new construction of a Student Services Center at El Camino College in Torrance,...
Kaiser AV – Solar Parking Structure
LANCASTER, CA We completed a solar project for Kaiser Medical Office Building in Lancaster, California. McWhirter Steel provided structural steel...
Trona SUPO
TRONA, CA We completed a project for the new SUPO (sulfur) Plant in Trona, California. This was a Fast Track project with around 1000 tons of...
SCE Substations
SOUTHERN CALIFORNIA For this new SCE Substation in Southern California, McWhirter Steel fabricated and installed all of the steel supports. We...
Searles Valley Minerals
TRONA, CA McWhirter Steel fabricated steel and performed thecomplex-coatingfor a new structure at Searless Valley Minerals.
Century at Tanforan
SAN BRUNO, CA McWhirter Steel fabricated steel for the newly constructed movie theater, Century at Tanforan, which consists of stadium seating for...
MOAH Art Museum
LANCASTER, CA McWhirter Steel performed new structural steel construction of the new MOAH Art Museum in downtown Lancaster, CA.